Human Factors Integration


Human Factors Integration is the process adopted by a number of key industries (notably Defence, Rail, Air Traffic Control and Nuclear Industries) in Europe, USA and Australia to integrate human factors elements into the systems engineering, design and safety case process.

Although each industry has a slightly different framework, the underlying approach to Human Factors Integration is the same.


Paul Traub Associates offers the full suite of Human Factors Integration (HFI) services. As co-author of the first ever UK HFI guidance document (MoD Human Factors Guide for Marine Engineering Systems) and also the first ever UK Rail Human Factors Integration Plan (HFIP), the company's experience is second to none.

HFIPs have been produced for a vast range of hazardous industries and have been followed through with application of the full HFIP process if needed. Typical services that we provide include the following:

  • HFIPs
  • Human Factors Risk Registers
  • Human Factors Issues Logs
  • Human Factors Integration with Safety Assessment
  • Human Factors Integration with Design and Systems Engineering
  • Human Factors Independent Technical Assessment
  • Human Factors Assurance



Paul Traub Associates
is an acknowledged expert in Human Factors Integration and Paul has provided over 25 HFIPs for High Hazard Industry Clients including the following:

  • Babcock Marine
  • Atomic Weapons Establishment
  • Network Rail
  • London Underground
  • Tubelines
  • RailCorp New South Wales
  • Birse Metro
  • Boeing
  • MoD
  • Racal Radar and Defence Systems
  • Eurocontrol
  • NATO
  • BAE Systems (Combat Systems)
  • General Dynamics Mission Systems
  • Network Rail


With successful delivery of nearly 30 HFI projects in different hazardous industries we can provide tailored solutions for your requirements.


Find out more below about the industries and clients that Paul Traub Associates Limited works with.

The areas we work in

Industries

Paul Traub Associates Limited has worked in numerous industries, with extensive experience in Rail, Nuclear, Defence, Oil and Gas and Commercial.





Read More

Who we work with

Clients

Paul Traub Associates Limited has over 30 years of experience in working in hazardous industries. We provide a unique, pragmatic, yet focused approach. Our technical expertise reflects our uncompromising focus on quality that provides value for money.

Our current portfolio includes a number of blue chip organisations and niche specialist companies.

Read More

Peer Gynt
Cameley Road
Temple Cloud
Bristol BS39 5AF

Tel: 07805 276 284
paul@traub-associates.co.uk

Placeholder Picture